Superior protection provided by ScarGuard
ScarGuard success in trenchless crossing construction of 2400 ft of a gas pipeline under the Rocky River in North Carolina, USA.
9th November 2023
Protecting pipelines during HDD
A 2400-foot section of a 30-inch OD gas pipeline was to be installed under the Rocky River in North Carolina by Horizontal Directional Drilling (HDD).
Protecting the future
Protecting the future
Protecting the future
ScarGuard special features
- 33% more gouge resistance than other composite products
- 40% more abrasion resistance than other composites
- Safe, Fast, and Easy Installation.
- Fast Curing (30-45 minutes)
- Excellent Track Record
- Patented Technology